***THE INFORMATION BELOW IS NOT OFFICIAL SPRINT INFORMATION. IT IS AN ESTIMATION OF LTE PROGRESS. I makes no claims, promises, or guarantees about the accuracy, completeness, or adequacy of the contents of this information. No warranty of any kind, implied or expressed, is given with respect to the contents of this website or its links to other Internet resources. The information contained on this web site is provided in good faith, and every reasonable effort is made to ensure that it is accurate and up to date. Any person relying on any of the information contained on this web site or making any use of the information contained herein, shall do so at their own risk. Please verify LTE in your area BEFORE purchasing an LTE device or entering a contract with Sprint***

Updated as of April 18th]

To keep track of when you'll be getting Network Vision / LTE go to:

http://s4gru.com/index.php?/topic/212-network-visionlte-deployment-running-list/

TOTAL ANNOUNCED MARKETS (47)
-------------------------------------------------------------------------------------------------
FIRST ROUND MARKETS (14):

First round markets have no preceding markets before them. NV OEM's will mobilize in these markets and begin deployment. These markets will deploy slowly as there is a significant learning curve to Network Vision. Most first round markets started between December 2011 and March 2012.

Atlanta/Athens
...Sites Complete = 71%; LTE Launched = July 15, 2012
...Original Scheduled Completion = December 2012; Current Production Rate Completion = November 2013
San Antonio
...Sites Complete = 78%; LTE Launched = July 15, 2012
...Original Scheduled Completion = October 2012; Current Production Rate Completion = July 2013
Houston
...Sites Complete = 70%; LTE Launched = July 15, 2012;
...Original Scheduled Completion = February 2013; Current Production Rate Completion = November 2013
DFW (Dallas/Ft. Worth)
...Sites Complete = 62%; LTE Launched = July 15, 2012
...Original Scheduled Completion = November 2012; Current Production Rate Completion = August 2013
Kansas (Kansas City/Wichita)
...Sites Complete = 82%; LTE Launched = July 15, 2012
...Original Scheduled Completion = December 2012; Current Production Rate Completion = June 2013
Baltimore
...Sites Complete = 77%; LTE Launched = August 30, 2012
...Original Scheduled Completion = December 2012; Current Production Rate Completion = September 2013
Boston
...Sites Complete = 71%; LTE Launched = January 28, 2013 (Prelaunched OCT 2012)
...Original Scheduled Completion = February 2013; Current Production Rate Completion = October 2013
Chicago
...Sites Complete = 94%; LTE Launched = December 2012
...Original Scheduled Completion = December 2012; Current Production Rate Completion = May 2013
LA Metro (Los Angeles)
...Sites Complete = 47%; LTE Launched = April 18, 2013
...Original Scheduled Completion = January 2013; Current Production Rate Completion = November 2013
Washington, D.C.
...Sites Complete = 49%; Anticipated LTE Launch = Spring 2013
...Original Scheduled Completion = January 2013; Current Production Rate Completion = December 2013
New York City (NYC/Westchester)
...Sites Complete = 48%; Anticipated LTE Launch = Spring 2013
...Original Scheduled Completion = May 2013; Current Production Rate Completion = February 2014
Austin
...Sites Complete = 75%; LTE Launched = January 28, 2013
...Original Scheduled Completion = November 2012; Current Production Rate Completion = August 2013
Central Jersey
...Sites Complete = 25%; Anticipated LTE Launch = Spring 2013
...Original Scheduled Completion = February 2013; Current Production Rate Completion = December 2013
San Francisco
...Sites Complete = 54%; Anticipated Launch = Spring 2013 (North Bay launched 12/2012, East Bay 2/2013)
...Original Scheduled Completion = July 2013; Current Production Rate Completion = December 2013



--------------------------------------------------------------------------------------------

SECOND ROUND MARKETS (27):

There is a lot of variability of when Second Round markets start, between July 2012 and December 2012. Some preliminary work is being done in advance in these Second Markets as well. Stay tuned to S4GRU.com for updates.

SECOND ROUND MARKETS (28):
There is a lot of variability of when Second Round markets start, approx. between July 2012 and December 2012.

PR/VI*(Puerto Rico/Virgin Islands)...Sites Complete*= 99%;*LTE Launched*= March 4, 2013...Original Scheduled Completion*= May 2013; Current Production Rate Completion = April 2013

South Bay*(San Jose)...Sites Complete*= 32%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= August 2013; Current Production Rate Completion = November 2013

Philadelphia Metro...Sites Complete*= 33%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= July 2013; Current Production Rate Completion = January 2014

Ft. Wayne/South Bend...Sites Complete*= 64%;*LTE Launched*= January 28, 2013*(South Bend launched November 2012)...Original Scheduled Completion= April 2013; Current Production Rate Completion = June 2013

Indianapolis...Sites Complete*= 65%;*LTE Launched*= December 18, 2012...Original Scheduled Completion*= May 2013; Current Production Rate Completion = July 2013

Shentel...Sites Complete*= 52%;*LTE Launched*= November 26, 2012...Original Scheduled Completion*= December 2013; Current Production Rate Completion = TBD

Miami/West Palm...Sites Complete*= 28%;*Anticipated LTE Launch*= Spring 2013*(West Palm Beach launched 4/18)...Original Scheduled Completion*= February 2013; Current Production Rate Completion = December 2013

Riverside/San Bernardino...Sites Complete*= 40%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= October 2013; Current Production Rate Completion = January 2014

Memphis...Sites Complete*= 26%;*LTE Launched*= April 18, 2013...Original Scheduled Completion*= February 2013; Current Production Rate Completion = August 2013

Nashville...Sites Complete*= 29%;*Anticipated LTE Launch*= Spring 2013*(Greeneville/Tullahoma launched 4/18)...Original Scheduled Completion*= February 2013; Current Production Rate Completion = December 2013

Orange County, California...Sites Complete*=36%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= August 2013; Current Production Rate Completion = January 2014

Charlotte...Sites Complete*= 53%;*LTE Launched*= April 18, 2013*(Asheville launched 3/4/2013)...Original Scheduled Completion*= December 2012; Current Production Rate Completion = August 2013

Orlando...Sites Complete*= 28%;*Anticipated LTE Launch*= Spring 2013*(Palm Bay/Port St. Lucie launched 4/18)...Original Scheduled Completion*= May 2013; Current Production Rate Completion = October 2013

Jacksonville...Sites Complete*= 26%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= March 2013; Current Production Rate Completion = November 2013

Raleigh/Durham...Sites Complete*= 25%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= August 2013; Current Production Rate Completion = December 2013

San Diego...Sites Complete*= 35%;*Anticipated LTE Launch*= Spring 2013...Original Scheduled Completion*= May 2013; Current Production Rate Completion = September 2013

Minnesota...Sites Complete*= 15%;*Anticipated LTE Launch= Spring 2013*(LaCrosse launched 3/4, Mankato 4/18)...Original Scheduled Completion*= September 2013; Current Production Rate Completion = September 2014

Tampa...Sites Complete*= 39%;Anticipated LTE Launch= Spring 2013...Original Scheduled Completion*= March 2013; Current Production Rate Completion = September 2013

Northern Jersey...Sites Complete*= 18%;*Anticipated LTE Launch= Spring 2013...Original Scheduled Completion*= September 2013; Current Production Rate Completion = February 2014

Long Island...Sites Complete*= 22%;*Anticipated LTE Launch= Spring 2013...Original Scheduled Completion*= September 2013; Current Production Rate Completion = June 2014

Norfolk*(Hampton Roads/Tidewater)...Sites Complete*= 31%;*LTE Launched*= April 18, 2013...Original Scheduled Completion*= February 2013; Current Production Rate Completion = September 2013

Southern Connecticut...Sites Complete*= 31%;*Anticipated LTE Launch= Spring 2013...Original Scheduled Completion*= August 2013; Current Production Rate Completion = October 2013

New Orleans...Sites Complete*= 43%;*Anticipated LTE Launch= Spring 2013*(Northshore launched 3/4/2013)...Original Scheduled Completion*= May 2013; Current Production Rate Completion = September 2013

East Michigan*(Detroit)...Sites Complete*= 9%;*Anticipated LTE Launch= Summer 2013...Original Scheduled Completion*= September 2013; Current Production Rate Completion = February 2015

West Michigan*(Grand Rapids/Lansing)...Sites Complete*= 14%;*Anticipated LTE Launch= Summer 2013...Original Scheduled Completion*= August 2013; Current Production Rate Completion = January 2014

West Washington*(Seattle)...Sites Complete*= 9%;*Anticipated LTE Launch= Summer 2013...Original Scheduled Completion*= September 2013; Current Production Rate Completion = January 2014

Oregon/SW Washington*(Portland)...Sites Complete*= 14%;*Anticipated LTE Launch= Summer 2013...Original Scheduled Completion*= September 2013; Current Production Rate Completion = February 2014

South West Florida...Sites Complete*= 25%;*Anticipated LTE Launch= Summer 2013...Original Scheduled Completion*= March 2013; Current Production Rate Completion = September 2013

-----------------------------------------------------------------------------

THIRD ROUND MARKETS (15):
Below are markets that are in the Third Round, with scheduled starts from December 2012 to May 2013. However, some have started a little earlier. This list is not complete of all markets in this round.


North LA...Sites Complete*= 32%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = October 2013

VT/NH/ME...Sites Complete*= 54%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = December 2013

Upstate NY East...Sites Complete*= 30%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = March 2014

Upstate NY Central...Sites Complete*= 52%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = July 2013

Providence...Sites Complete*= 32%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q3 2013; Current Production Rate Completion = November 2013

Delaware...Sites Complete*= 42%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q3 2013; Current Production Rate Completion = November 2013

Southern Jersey...Sites Complete*= 17%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = January 2014

Georgia...Sites Complete*= 37%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = January 2014

Alabama...Sites Complete*= 34%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = January 2014

Myrtle Beach...Sites Complete*= 29%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = December 2013

Colorado...Sites Complete*= <1%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = TBD

North Wisconsin...Sites Complete*= 1%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = TBD

Mississippi...Sites Complete*= 53%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = December 2013

Northern Connecticut...Sites Complete*= 34%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = August 2014

Central Illinois...Sites Complete*= <1%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = TBD

East Iowa...Sites Complete*= 30%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = June 2014

Arkansas...Sites Complete*= 35%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = December 2013

East Texas...Sites Complete*= 32%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = TBD

South Carolina...Sites Complete*= 24%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = November 2013

Las Vegas...Sites Complete*= 23%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q4 2013; Current Production Rate Completion = March 2014

Central Pennsylvania...Sites Complete*= 11%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q1 2014; Current Production Rate Completion = October 2013

Gulf Coast...Sites Complete*= 10%;*Anticipated LTE Launch*= TBD...Original Scheduled Completion = Q1 2014; Current Production Rate Completion = February 2015

Missouri...Sites Complete*= 3%;*Anticipated LTE Launch*= TBD*(Joplin launched 4/18/13)...Original Scheduled Completion = Q1 2014; Current Production Rate Completion = TBD

GA/SC Coast...Sites Complete*= 19%;*Anticipated LTE Launch = TBD...Original Scheduled Completion = Q1 2014; Current Production Rate Completion = February 2015

The Panhandle...Sites Complete = 16%; Anticipated Launch = TBD; Anticipated Completion*= June 2014Louisiana...Sites Complete = 30%; Anticipated Launch = TBD; Anticipated Completion*= June 2014

Phoenix...Sites Complete = 9%; Anticipated Launch = TBD; Anticipated Completion*= January 2014Oklahoma...Sites Complete*= 9%; Anticipated Launch = TBD; Anticipated Completion*= January 2014

South Texas...Sites Complete = 6%; Anticipated Launch = TBD; Anticipated Completion*= June 2014Tucson/Yuma...Sites Complete = 9%; Anticipated Launch = TBD; Anticipated Completion*= February 2014

Western Pennsylvania...Sites Complete = 11%; Anticipated Launch = TBD; Anticipated Completion*= December 2013West Texas...Sites Complete = 5%; Anticipated Launch = TBD; Anticipated Completion*= June 2014

Inland Northwest...Sites Complete = 13%; Anticipated Launch = TBD; Anticipated Completion*= TBDPittsburgh...Sites Complete = 1%; Anticipated Launch = TBD; Anticipated Completion*= TBD

Albuquerque...Sites Complete = 0%; Anticipated Launch = TBD; Anticipated Completion*= TBDEast Kentucky...Sites Complete = 0%; Anticipated Launch = TBD; Anticipated Completion*= TBD

West Kentucky...Sites Complete = <1%; Anticipated Launch = TBD; Anticipated Completion*= TBDMilwaukee...Sites Complete = 0%; Anticipated Launch = TBD; Anticipated Completion*= TBD

Cleveland...Sites Complete = 0%; Anticipated Launch = TBD; Anticipated Completion*= TBDColumbus...Sites Complete = <1%; Anticipated Launch = TBD; Anticipated Completion*= TBD

Cincinnati...Sites Complete = 0%; Anticipated Launch = TBD; Anticipated Completion*= TBD

-----------------------------------------------------------------------------

Announced September 10th
http://newsroom.sprint.com/article_display.cfm?article_id=2382

Aguadilla-Isabela-San Sebastian, Puerto Rico
Albermarle, N.C.
Anderson, Ind.
Asheville, N.C.
Athens, Tenn.
Athens, Texas
Austin, Texas
Barnstable Town (Hyannis/Midcape), Mass.
Baton Rouge, La.
Bethesda-Rockville-Frederick, Md.
Boston
Cambridge-Newton-Framingham, Mass.
Charlotte, N.C.
Chattanooga, Tenn.
Chicago
Clarksville, Tenn.
Cleveland, Tenn.
Coamo, Puerto Rico
College Station, Texas
Columbia, Tenn.
Columbus, Ind.
Cookeville, Tenn.
Crossville, Tenn.
Daytona Beach-Deltona-Ormond Beach, Fla.
Elkhart-Goshen, Ind.
Fayetteville, N.C.
Fort Lauderdale-Pompano Beach-Deerfield Beach, Fla.
Gainesville, Fla.
Gary, Ind.
Goldsboro, N.C.
Greenville, N.C.
Greeneville, Tenn.
Guayama, Puerto Rico
Hammond, La.
Harriman, Tenn.
Hickory-Lenoir-Morganton, N.C.
Houma-Bayou Cane-Thibodaux, La.
Hutchinson, Kan.
Indianapolis-Carmel, Ind.
Jacksonville, Fla.
Johnson City, Tenn.
Jonesboro, Ark.
Kankakee-Bradley-Bourbonnais, Ill.
Kerrville, Texas
Killeen-Temple-Fort Hood, Texas
Kingsport-Bristol, Tenn.
Kinston, N.C.
Knoxville, Tenn.
Lakeland-Winter Haven, Fla.
Lancaster, S.C.
Lawrence, Kan.
Lincolnton, N.C.
Los Angeles-Long Beach-Glendale, Calif.
Lumberton, N.C.
McPherson, Kan.
Memphis, Tenn.
Miami-Miami Beach-Kendall, Fla.
Morgan City, La.
Morristown, Tenn.
Mayaguez, Puerto Rico
Muncie, Ind.
Nashville, Tenn.
New Orleans
New York-White Plains-Wayne, N.Y.
Norfolk-Virginia Beach-Newport News, Va.
Ocala, Fla.
Ocean Pines, Md.
Palatka, Fla.
Palm Bay-Melbourne-Titusville, Fla.
Peabody/Lawrence-Methuen/Gloucester, Mass.
Philadelphia
Ponce, Puerto Rico
Port St. Lucie, Fla.
Roanoke Rapids, N.C.
Rochelle, Ill.
Rockford, Ill.
Rocky Mount, N.C.
Salina, Kan.
Salisbury, Md.
Salisbury, N.C.
San German-Cabo Rojo, Puerto Rico
San Juan, Puerto Rico
Sebastian-Vero Beach, Fla.
Sevierville, Tenn.
Shelby, N.C.
Southern Pines-Pinehurst, N.C.
Springfield, Mass.
Statesville-Mooresville, N.C.
St. Thomas, USVI
Tampa-St. Petersburg-Clearwater, Fla.
Topeka, Kan.
Tullahoma, Tenn.
Tupelo, Miss.
Warrensburg, Mo.
Washington, D.C.-Arlington-Alexandria, Va.
Waukegan-Lake County, Ill.
West Palm Beach-Boca Raton-Boynton Beach, Fla.
Wichita, Kan.
Wichita Falls, Texas
Wilson, N.C.
Worcester-Fitchburg-Leominster, Mass.
Yauco, Puerto Rico

Announced October 12th:
Sprint Community Announcement
San Francisco, CA, San Mateo-Redwood City, CA
Cape Coral-Ft Myers, FL
Dyersburg-Union City-Martin, TN
Emporia, KS
Fort Wayne, IN
Greenwood, MS
Joplin, MO
Kokomo, IN
Lafayette/West Lafayette, IN
Lexington Park, MD
Marion, IN
Napa, CA
Naples-Marco Island, FL
Ottawa-Streator, IL
Punta Gorda, FL
Santa Rosa-Petaluma, CA
Sarasota-Bradenton, FL
Sebring, FL
South Bend-Mishawaka, IN
Terre Haute, IN
Vallejo-Fairfield, CA
Warsaw, IN

Announced October 22nd:
Sprint 4G LTE Network Update

We want to share an update about the progress we are making with bringing Sprint customers an all-new 4G LTE network.
A number of communities in the greater Chicago area, in addition to other cities in Kansas, Massachusetts and Texas, now are able to experience the power and speed of Sprint’s all-new 4G LTE.

Cities include:
Chicago Area Suburbs: Addison, Bolingbrook, Des Plaines, Downers Grove, Kankakee, Rockford, Joliet, Naperville, Palatine and Plainfield
Gary, IN
Hutchinson and McPherson, KS
New Bedford and Fall River, MA
Wichita Falls, TX

Announced November 13th:
Sprint 4G LTE Network Update

Minneapolis/St. Paul, Minn.
Fort Smith, Ark.
Ardmore, Okla.
Oakland/Fremont/
Michigan City/
McAllen/Edinburg/
Hayward, Calif.
La Porte, Ind.
Mission, Texas
Key West, Fla.
Bloomington, Ind.
Eau Claire, Wis.

Announced January 16:
Sprint 4G LTE Network Update

Albany, GA
Anderson, SC
Bay City, MI
Branson, MO
Bremerton/Silverdale, WA
Columbus, GA
Columbus, MS
Decatur, AL
Florence/Muscle Shoals, AL
Gadsden, AL
Gaffney, SC
Gettysburg, PA
Glasgow, KY
Homosassa Springs, FL
Hot Springs, AR
Lake City, FL
Lake Havasu City/Kingman, AZ
Midland, MI
Nacogdoches, TX
Opelousas/Eunice, LA
Oxford, MS
Paris, TX
Pittsfield, MA
Saginaw, MI
Spartanburg, SC
The Villages, FL
Waycross, GA
Winona, MN

Announced March 4th:
Sprint 4G LTE Network Update

Altoona, Pa.
Asheville, N.C.
Columbus, Ind.
Elkhart/Goshen, Ind.
Hammond, La.
La Crosse, Wis.
San Juan, Puerto Rico
Statesville, N.C.
Temple, Texas
San Germán, Yauco, Salinas and Santa Isabel, Puerto Rico

Announced April 18th:
Sprint 4G LTE Network Update

Albemarle, N.C.
Bloomington, Ind.
Charlotte, N.C.
Contra Costa County, Calif.
Denison, Texas
Greeneville, Tenn.
Joplin, Mo.
Kerrville, Texas
Lafayette, Ind.
Lincolnton, N.C.
Los Angeles
Mankato/North Mankato, Minn.
Memphis, Tenn.
Norfolk/Virginia Beach/Newport News, Va.
Palm Bay, Fla.
Port St. Lucie, Fla.
Rochelle, Ill.
Salisbury, N.C.
Shelby, N.C.
Tullahoma, Tenn.
West Palm Beach, Fla.
Fargo, N.D.
Orlando, Fla.
Portland, Ore.
Spokane, Wash.
Tallahassee, Fla.
Albertville, Ala.
Centralia, Wash.
Coeur d’Alene, Idaho
Durant, Okla.
El Paso, Texas
Enid, Okla.
Enterprise/Ozark, Ala.
Eugene/Springfield, Ore.
Faribault/Northfield, Minn.
Greenville, :).
Hattiesburg, Miss.
Jacksonville, Texas
Kennewick/Pasco/Richland, Wash.
LaGrange, Ga.
Longview, Texas
Longview, Wash.
Milledgeville, Ga.
Moses Lake, Wash.
Paducah, Ky.
Picayune, Miss.
Poplar Bluff, Mo.
Russellville, Ark.
Seaford, Del.
Sterling, Ill.
Talladega/Sylacauga, Ala.
Tulsa, Okla.
Valdosta, Ga.
Wenatchee/East Wenatchee, Wash.
Yakima, Wash.

4G LTE Launched Markets as of April 18, 2013:
Sprint 4G LTE Network Update

Albemarle, NC
Altoona, Pa.
Anderson, Ind.
Asheville, N.C.
Athens, Ga.
Atlanta
Austin, Texas
Baltimore
Barnstable/Hyannis/Mid-Cape, Mass.
Bloomington, IN
Boston
Bryan/College Station, Texas
Calhoun, Ga.
Carrollton, Ga.
Charlotte, NC
Chicago/Naperville/Joliet, Ill.
Clark County, Va./Jefferson County, W.Va.
Columbia, Tenn.
Columbus, Ind.
Contra Costa County, CA
Dallas
Denison, TX
Elkhart/Goshen, Ind.
Emporia, Kan.
Fort Wayne, Ind.
Fort Worth, Texas
Framingham, Mass.
Franklin County, Pa.
Gainesville, Ga.
Gary, Ind.
Gettysburg, Pa.
Granbury/Hood County, Texas
Greeneville, TN
Hagerstown, Md./Martinsburg, W.Va.
Hammond, La.
Harrisburg/Carlisle/Hershey, Pa.
Harrisonburg, Va.
Houston
Huntsville, Texas
Hutchinson, Kan.
Indianapolis/Carmel, Ind.
Joplin, MO
Kankakee/Bradley/Bourbonnais, Ill.
Kansas City, Kan./Mo.
Kerrville, TX
La Crosse, Wis.
Lafayette, IN
Lawrence, Kan.
Lincolnton, NC
Los Angeles, CA
Manhattan/Junction City, Kan.
Mankato-North Mankato, MN
McPherson, Kan.
Memphis, TN (city of Memphis)
Muncie, Ind.
New Bedford/Fall River, Mass.
Newnan, Ga.
Norfolk-Virginia Beach-Newport News, VA
Palm Bay, FL
Peabody, Mass.
Port St. Lucie, FL
Rochelle, IL
Rockford, Ill.
Rome, Ga.
Salina, Kan.
Salisbury, NC
San Antonio
San Juan, Puerto Rico
Santa Rosa/Petaluma, Calif.
Sedalia, Mo.
Shelby, NC
Shenandoah/Page Counties, Va.
South Bend/Mishawaka, Ind.
Southern Puerto Rico: Yauco/Ponce/Coamo/Salinas/Santa Isabel/Guayama
St. Joseph, Mo.
Statesville, N.C.
Temple, Texas
Topeka, Kan.
Tullahoma, TN
Vallejo/Fairfield, Calif.
Waco, Texas
Waukegan/Lake County, Ill.
West Palm Beach, FL
Western Puerto Rico: Aguadilla/Isabela/San Germán/Cabo Rojo/Mayagüez
Wichita Falls, Texas
Wichita, Kan.
Winchester, Va.
York/Hanover, Pa.
 
Last edited:

ipclark1

Senior Member
Oct 29, 2007
309
32
0
We got Wimax already bro, the signal just doesn't go far. It's all over Midtown

The LTEVO says hello!
I literally dare you to use data on any sprint phone in midtown without throwing the device at some annoying tourist as they speed by on foot using their device that is actually usable...

Sent from my EVO using xda premium
 
  • Like
Reactions: Dogie52

KaoMinerva

Senior Member
Sep 8, 2011
2,628
490
0
Memphis, TN
I literally dare you to use data on any sprint phone in midtown without throwing the device at some annoying tourist as they speed by on foot using their device that is actually usable...

Sent from my EVO using xda premium
My evo3d gets Wimax at my house bro. I'm not talking deep Midtown, I'm talking around the poplar & Cleveland area. Highest speeds I ever seen on Wimax was in the t Mobile store on my EVO 3d, score was 12 down 7.5 up no lie

The LTEVO says hello!
 

leftspoke

Senior Member
Jun 18, 2010
64
33
0
Virginia Beach
I'm curious to see how wide-reaching this will be, since I'll be living about half an hour out from Baltimore come August. I'd be nice to at least be able to test it.

Network Vision Sites in the Baltimore market. More than fifty Network Vision sites are complete in the market.


Anticipated Sites Complete at Market Launch. According to the Network Vision schedules that S4GRU has reviewed, if Sprint launched the market in Mid July, these are the anticipated sites that would likely have LTE complete at that time. This would provide fairly good LTE coverage over many parts of the market.


http://s4gru.com/index.php?/blog/1/entry-266-baltimore-network-visionlte-deployment-schedule-update/
 
  • Like
Reactions: bacidath

leftspoke

Senior Member
Jun 18, 2010
64
33
0
Virginia Beach
in for memphis rollout.

yeeaa!!!
i had 4g from a tower at perkins/knight arnold. i bet it'll be the one of the first towers with LTE.
cant wait

Anticipated Sites Complete at Market Launch. According to the Network Vision schedules that S4GRU has reviewed, if Sprint launched the market in November, these are the anticipated sites that would likely have LTE complete at that time. This would provide fairly good LTE coverage over many parts of the market. Some sites will are scheduled to be live in Jackson, Dyersburg and Jonesboro at the time. However, Mississippi sites won't start until early 2013.


http://s4gru.com/index.php?/blog/1/entry-280-memphis-network-visionlte-deployment-schedule-update/